On August 15, 2025, Brazilian Electric Power Co reported the completion of an asset unbundling operation with Copel on May 30, 2025, acquiring the Colíder Hydroelectric Power Plant, which accounts for 0.5% of Eletrobras' total assets and has a capacity of 300 MW. Due to safety concerns, the dam safety level has been raised to 'ALERT' and reservoir levels are being reduced as a precaution.