Godawari Power & Ispat Ltd. has commissioned a new 48 MW Power Turbine Generator which has been synchronized with the grid at their Integrated Steel Plant in Raipur, Chhattisgarh, expected to generate additional 7 to 8 MW of electric power without additional fuel consumption.